Showing 71 - 80 of 148
This paper explores the link between accountability, corruption and efficiency in the context of a career concern model where politically con- nected local monopolies are in charge of the provision of a local public service. We fi?nd that both corruption and a low degree of accountabil- ity...
Persistent link: https://www.econbiz.de/10010736704
We compare a carbon tax and a cap and trade mechanism in their propensity to induce carbon-reducing technological adoption, when investments are undertaken under uncertainty. In our setting, risk-neutral firms affect the variance and the correlation of the shocks they are exposed to through...
Persistent link: https://www.econbiz.de/10010643597
We study optimal cartel prices in a two-sided market. We present a simple model showing that prices above the two-sided monopoly price may prevail on one side of a two-sided market as a means to enhance the sustainability of the cartel. We prove that in such a case a higher benefit from the...
Persistent link: https://www.econbiz.de/10010936552
The paper analyzes the evolution of the trade specialization patterns in Italy and its main trade partners (France, Germany, and the United States). In the methodological section we discuss the effectiveness of the Lafay index as an indicator of specialization. We then propose some modifications...
Persistent link: https://www.econbiz.de/10008543163
We estimate the bene ts resulting from completely interconnecting the Italian electricity spot market. The market is currently divided into two geographic zones - North and South - with limited interzonal transmission capacity that often induces congestion, and hence potential inefficiency. By...
Persistent link: https://www.econbiz.de/10005627685
Persistent link: https://www.econbiz.de/10011539757
Persistent link: https://www.econbiz.de/10012224875
Persistent link: https://www.econbiz.de/10010206317
In this paper we look at the relative merits of two capacity utilization regimes in the merchant electricity transmission network: Must offer (Mo) where the entire capacity installed is made available for transmission and Non Must Offer (NMo) where some capacity could be withheld. We look at two...
Persistent link: https://www.econbiz.de/10012957667
Persistent link: https://www.econbiz.de/10012415219