Showing 1 - 10 of 12
This paper considers a scheduling problem with two identical parallel machines. One has unlimited capacity; the other can only run for a fixed time. A given set of jobs must be scheduled on the two machines with the goal of minimizing the sum of their completion times. The paper proposes an...
Persistent link: https://www.econbiz.de/10005240522
Persistent link: https://www.econbiz.de/10005329847
Persistent link: https://www.econbiz.de/10005417827
Proton exchange membrane fuel cells (PEMFCs) is a promising candidate as energy systems. However, the stability and lifetime of cells are still important issues. The effect of surface roughness on metallic bipolar plate is discussed in this paper. Various roughness on the bulk surface are...
Persistent link: https://www.econbiz.de/10011040505
The performance of Al-alloy bipolar plates for the PEMFC (proton exchange membrane fuel cell) system is investigated in this paper. The metallic bipolar plates are modified with a Ni–P coating. The performance of the Al-alloy bipolar plates is evaluated by the coating structure, corrosion...
Persistent link: https://www.econbiz.de/10011041398
Persistent link: https://www.econbiz.de/10005311748
We consider an n-job, m-machine lot-streaming problem in a flowshop with equal-size sublots where the objective is to minimize the total weighted earliness and tardiness. To solve this problem, we first propose a so-called net benefit of movement (NBM) algorithm, which is much more efficient...
Persistent link: https://www.econbiz.de/10005337086
This paper is concerned with coordination aspects of supply chain management and, in particular, investigates setup coordination between two and three stages of a supply chain. The problem arises from a real application in the production chain of a kitchen furniture plant. In different stages of...
Persistent link: https://www.econbiz.de/10005339667
In the scheduling literature, it is often assumed that jobs arrive either simultaneously or individually. However, this assumption is invalid in most practical situations because jobs usually arrive in batches, e.g., the final testing house in the manufacturing of semiconductor. The concept of...
Persistent link: https://www.econbiz.de/10008521497
Persistent link: https://www.econbiz.de/10005417785