Showing 1 - 10 of 45
Persistent link: https://www.econbiz.de/10013167518
Persistent link: https://www.econbiz.de/10014580479
Purpose: Basic project control through traditional methods is not sufficient to manage the majority of real-time events in most construction projects. The purpose of this paper is to propose a Dynamic Scheduling (DS) model that utilizes multi-objective optimization of cost, time, resources and...
Persistent link: https://www.econbiz.de/10012184419
Persistent link: https://www.econbiz.de/10003981457
Persistent link: https://www.econbiz.de/10009547229
Persistent link: https://www.econbiz.de/10009261009
Persistent link: https://www.econbiz.de/10011431044
Persistent link: https://www.econbiz.de/10011299674
Persistent link: https://www.econbiz.de/10011334649
Persistent link: https://www.econbiz.de/10011317970