Chiu, Yuan-Shyi Peter; Chang, Huei-Hsin - In: Economic Modelling 37 (2014) C, pp. 143-148
In a recent study [Chiu et al., 2007. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research 180, 664–676], the perfect rework of nonconforming items was assumed in a production system that is subject to stochastic...