Showing 1 - 10 of 59
Persistent link: https://www.econbiz.de/10012484626
Persistent link: https://www.econbiz.de/10012229009
Persistent link: https://www.econbiz.de/10011700716
Persistent link: https://www.econbiz.de/10011655152
Persistent link: https://www.econbiz.de/10011669230
Persistent link: https://www.econbiz.de/10012183685
Persistent link: https://www.econbiz.de/10012183687
The decision whether to use all the available machines in the shop becomes very relevant when the capacity exceeds the demand. In such cases, it might be optimal to use only a subset of the machines. We study this option in a two-stage flowshop environment. Jobs are assumed to be identical, and...
Persistent link: https://www.econbiz.de/10010869075
Persistent link: https://www.econbiz.de/10014329189
A scheduling problem with a common due-window, earliness and tardiness costs, and identical processing time jobs is studied. We focus on the setting of both (i) job-dependent earliness/tardiness job weights and (ii) parallel uniform machines. The objective is to find the job allocation to the...
Persistent link: https://www.econbiz.de/10010664723