Showing 1 - 10 of 59
Persistent link: https://www.econbiz.de/10012484626
Persistent link: https://www.econbiz.de/10012229009
Persistent link: https://www.econbiz.de/10012183685
Persistent link: https://www.econbiz.de/10012183687
We study a batch-scheduling problem of unit-time jobs on a two-stage flexible flowshop. The objective functions are minimum makespan and minimum flowtime. Unlike previously studied models: (i) a general number of machines in both stages of the flowshop is allowed, and (ii) there is no...
Persistent link: https://www.econbiz.de/10011076778
The decision whether to use all the available machines in the shop becomes very relevant when the capacity exceeds the demand. In such cases, it might be optimal to use only a subset of the machines. We study this option in a two-stage flowshop environment. Jobs are assumed to be identical, and...
Persistent link: https://www.econbiz.de/10010869075
A scheduling problem with a common due-window, earliness and tardiness costs, and identical processing time jobs is studied. We focus on the setting of both (i) job-dependent earliness/tardiness job weights and (ii) parallel uniform machines. The objective is to find the job allocation to the...
Persistent link: https://www.econbiz.de/10010664723
Persistent link: https://www.econbiz.de/10011669230
Persistent link: https://www.econbiz.de/10014329189
Persistent link: https://www.econbiz.de/10011700716