Showing 1 - 10 of 15,561
and industrial operations. A large number of monitoring schemes have been introduced to effectively control the … which are independent. However, the main feature of multistage processes is the cascade property which needs to be justified … monitoring scheme. In this paper, the accelerated failure time models are used and two regression-adjusted control schemes based …
Persistent link: https://www.econbiz.de/10010843953
Persistent link: https://www.econbiz.de/10012002188
Persistent link: https://www.econbiz.de/10011844206
Persistent link: https://www.econbiz.de/10014229231
Persistent link: https://www.econbiz.de/10011566087
Persistent link: https://www.econbiz.de/10011634077
Persistent link: https://www.econbiz.de/10011718136
Persistent link: https://www.econbiz.de/10011809997
Persistent link: https://www.econbiz.de/10011930117
Persistent link: https://www.econbiz.de/10003493329