Showing 1 - 10 of 27
Persistent link: https://www.econbiz.de/10011987277
Persistent link: https://www.econbiz.de/10011724409
Persistent link: https://www.econbiz.de/10011655070
Persistent link: https://www.econbiz.de/10011611142
Persistent link: https://www.econbiz.de/10012183675
This paper addresses the problem of scheduling unit-time operations with integral and non-negative time delay considerations on a two-machine open-shop environment. The criterion to minimize is the makespan. Two well solvable cases and two approximation algorithms, with their worst-case...
Persistent link: https://www.econbiz.de/10008483265
Persistent link: https://www.econbiz.de/10012084198
Persistent link: https://www.econbiz.de/10013207278
Persistent link: https://www.econbiz.de/10013173846
Persistent link: https://www.econbiz.de/10012063832