Showing 1 - 10 of 3,256
The planning of purchasing and production lot-size for multi-item multi-period multi-workstation capacitated production (MLCLSP-M) is discussed. Since the model is a NP-hard problem, this research proposes a heuristic method (A-LS), which decomposes the model into two sub-problems and...
Persistent link: https://www.econbiz.de/10009352925
Persistent link: https://www.econbiz.de/10012193999
Persistent link: https://www.econbiz.de/10013502417
Persistent link: https://www.econbiz.de/10012820154
Persistent link: https://www.econbiz.de/10013259243
Persistent link: https://www.econbiz.de/10012238915
Persistent link: https://www.econbiz.de/10011628309
Persistent link: https://www.econbiz.de/10011686222
Persistent link: https://www.econbiz.de/10011887626
Persistent link: https://www.econbiz.de/10011740422