Showing 1 - 10 of 10
Persistent link: https://www.econbiz.de/10011448515
Persistent link: https://www.econbiz.de/10012063414
Persistent link: https://www.econbiz.de/10011698841
Persistent link: https://www.econbiz.de/10011987679
Persistent link: https://www.econbiz.de/10012021993
We consider a model for a serial supply chain in which production, inventory, and transportation decisions are integrated in the presence of production capacities and concave cost functions. The model we study generalizes the uncapacitated serial single-item multilevel economic lot-sizing model...
Persistent link: https://www.econbiz.de/10009214178
One of the basic assumptions of the classical dynamic lot-sizing model is that the aggregate demand of a given period must be satisfied in that period. Under this assumption, if backlogging is not allowed, then the demand of a given period cannot be delivered earlier or later than the period. If...
Persistent link: https://www.econbiz.de/10009203705
We consider the Capacitated Economic Lot Size Problem with piecewise linear production costs and general holding costs, which is an NP-hard problem but solvable in pseudo-polynomial time. A straightforward dynamic programming approach to this problem results in an O(n <sup>2</sup> c\bar d\bar ) algorithm,...
Persistent link: https://www.econbiz.de/10009203831
Persistent link: https://www.econbiz.de/10011799006
Persistent link: https://www.econbiz.de/10014471530