Showing 1 - 3 of 3
This paper presents a hybrid genetic algorithm for a dynamic continuous berth allocation and quay crane scheduling problem. In the first phase of the algorithm, vessels are positioned at berthing locations and quay cranes are assigned to vessels using novel crane assignment heuristics. In the...
Persistent link: https://www.econbiz.de/10008672307
In this paper, we present a new genetic algorithm for the resource-constrained project scheduling problem with discounted cash flows and investigate the trade-off between a project’s net present value and its corresponding lead time. We consider a problem formulation where the pre-specified...
Persistent link: https://www.econbiz.de/10004982978
In this paper we present a genetic algorithm for the multi-mode resource-constrained project scheduling problem (MRCPSP), in which multiple execution modes are available for each of the activities of the project. In contrast to a conventional genetic algorithm, we apply a bi-population genetic...
Persistent link: https://www.econbiz.de/10004983014