In this paper, we present a meta-heuristic algorithm for the well-known resource-constrained project scheduling problem with discounted cash flows. This optimization procedure maximizes the net present value of project subject to the precedence and renewable resource constraints. The problem is...
Persistent link: https://www.econbiz.de/10004982962
In this paper, we present a new genetic algorithm for the resource-constrained project scheduling problem with discounted cash flows and investigate the trade-off between a project’s net present value and its corresponding lead time. We consider a problem formulation where the pre-specified...
Persistent link: https://www.econbiz.de/10004982978
Time/cost trade-offs have been extensively studied in the literature since the development of the critical path method. Recently, the discrete version of the problem formulation has been extended to various practical assumptions, and solved with both exact and heuristic optimization procedures....
Persistent link: https://www.econbiz.de/10004983076