The scheduling of projects has gained increasing attention since the introduction of PERT and CPM. Both the scheduling literature and the software scheduling packages rely on heuristic and optimal procedures to schedule projects under various assumptions. However, there is still room for...
Persistent link: https://www.econbiz.de/10004982862
Repetitive projects involve the repetition of activities along the stages of the project. Since the resources required to perform these activities move from one stage to the other, a main objective of scheduling these projects is to maintain the continuity of work of these resources so as to...
Persistent link: https://www.econbiz.de/10004982871
The paper describes the results of an exploratory research study on the application of programme management in six companies. A classification of programmes is developed that may help in understanding the differences between programmes and the managerial impact of these differences. The research...
Persistent link: https://www.econbiz.de/10004982960
In this paper we introduce the concept of due date assignment in the project scheduling literature. Despite the fact that due date assignment problems belongs to the core of the machine scheduling literature, no attempts have been made to tackle this problem in a project scheduling environment....
Persistent link: https://www.econbiz.de/10004982972
Recently, time-switch constraints have been introduced in the literature by Yang and Chen (2000). Basically, these constraints impose a specified starting time on the project activities and force them to be inactive during specified time periods. This type of constraints have been incorporated...