-called Level Scheduling (LS), which aims to distribute the part consumption in-duced by a model sequence evenly over the planning …
Persistent link: https://www.econbiz.de/10005870689
truck loads in order to realize economies in transportation. Inthis context, the truck scheduling problem, which decides on …-time deliveries. Due to its high real-world signicance,several truck scheduling procedures have been introduced within the recentyears … a classication ofdeterministic truck scheduling. With the help of this classication, existingliterature is reviewed and …
Persistent link: https://www.econbiz.de/10005870693
proposea new approach for scheduling JIT part supply from a central storage center. Usually,materials are stored in boxes that … is the first time astatistical analysis is being made as to whether widespread Level Scheduling policies,which are well …
Persistent link: https://www.econbiz.de/10005870694
socalled Level Scheduling, which aims at distributing the part consumption induced bythe model sequence evenly over time …. Traditional Level Scheduling seeks to closelyapproximate target demand rates at every production cycle, however, such a … pattern between two delivery pointsseems irrelevant. The paper on hand provides new Level Scheduling models, provescomplexity …
Persistent link: https://www.econbiz.de/10005870695
aspect leads to a joint balancing and scheduling problem, which we call SUALBSP (setup assemblyline balancing and scheduling …
Persistent link: https://www.econbiz.de/10005870709
At rail-road transshipment yards, gantry cranes move containers from freighttrains to trucks and vice versa. They constitute important entities in today'sintermodal transportation systems. Real-world yards are often partitionedinto several disjunct crane areas, so that crane interferences during...
Persistent link: https://www.econbiz.de/10005870715
The generation of leveled production schedules is of high impor-tance for mixed-model assembly lines whose parts and materials are suppliedjust-in-time by multi-level production processes. The Output Rate Variatonproblem is the standard mathematical representation of this complex levelscheduling...
Persistent link: https://www.econbiz.de/10005870722
continuously arising duringthe daily operations of a transshipment yard is the train scheduling problem, which decideson the …
Persistent link: https://www.econbiz.de/10005870732
Scheduling landings of aircrafts is an essential problem which is continuouslysolved as part of the daily operations of …
Persistent link: https://www.econbiz.de/10005870735
Most approaches to multi-project scheduling are based on the assumption that resources can betransferred between …-project scheduling problem (RCMPSP) by additionallyincluding transfer times and cost. To integrate this aspect, in a first step, we … considerations and introduced as resource constrained multi-project scheduling problemwith transfer times and cost (RCMPSPTTC …
Persistent link: https://www.econbiz.de/10005870777