In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively...
Persistent link: https://www.econbiz.de/10005464831
In literature, both topological and resource-related measures are used to predict the difficulty of a project scheduling problem. Rapid progress regarding solution procedures has resulted in the development of a number of data generators in order to generate instances under a controlled design...
Persistent link: https://www.econbiz.de/10005464832
The resource-constrained project scheduling problem (RCPSP) is one of the most challenging problems in project scheduling. During the last couple of years many heuristic procedures have been developed for this problem, but still these procedures often fail in finding near-optimal solutions for...
Persistent link: https://www.econbiz.de/10005405389
Recently, time-switch constraints have been introduced in literature by Yang and Chen (2000). Basically, these constraints impose a specified starting time on the project activities and force them to be inactive during specified time periods. This type of constraints have been incorporated into...
Persistent link: https://www.econbiz.de/10005243367
In this paper we introduce the concept of due date assignment in the project scheduling literature. Despite the fact that due date assignment problems belongs to the core of the machine scheduling literature, no attempts have been made to tackle this problem in a project scheduling environment....
Persistent link: https://www.econbiz.de/10005607045
Earned value project management is a well-known management system that integrates cost, schedule and technical performance. It allows the calculation of cost and schedule variances and performance indices and forecasts of project cost and schedule duration. The earned value method provides early...
Persistent link: https://www.econbiz.de/10005243380
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during the past decades. Due to its strongly NP-hard status and the need for solving large realistic project instances, the recent focus has shifted from exact optimisation procedures to (meta-)...
Persistent link: https://www.econbiz.de/10005464791
The well-known resource-constrained project scheduling problem (RCPSP) schedules project activities within the precedence and renewable resource constraints while minimizing the total lead-time of the project. The basic problem description assumes non-pre-emptive activities with fixed durations,...
Persistent link: https://www.econbiz.de/10005464809
In this paper, we present a meta-heuristic algorithm for the well-known resource-constrained project scheduling problem with discounted cash flows. This optimization procedure maximizes the net present value of project subject to the precedence and renewable resource constraints. The problem is...
Persistent link: https://www.econbiz.de/10005464835
We present a finite capacity production scheduling algorithm for an integrated steel company located in Belgium. This multiple-objective optimization model takes various case-specific constraints into account and consists of two steps. A machine assignment step determines the routing of an...
Persistent link: https://www.econbiz.de/10005607038