Showing 1 - 1 of 1
The purpose of this study was to analyze the cost structures associated with subterminal facilities. An economic-engineering approach was used to determine the construction and operation costs of four different sizes of subterminal facilities operating at three different plant capacities....
Persistent link: https://www.econbiz.de/10005493911