Showing 1 - 10 of 16
Persistent link: https://www.econbiz.de/10011349633
Persistent link: https://www.econbiz.de/10009789401
Persistent link: https://www.econbiz.de/10014389024
Persistent link: https://www.econbiz.de/10011567017
Persistent link: https://www.econbiz.de/10011774259
An unpredictable breakdown often occurs and tends to complicate production scheduling in a steelmaking-continuous casting (SCC) plant. Because of particular characteristics and technology constraints of the SCC plant, traditional robust scheduling often provides an excessively conservative...
Persistent link: https://www.econbiz.de/10011278973
Bus network design is an important problem in public transportation. In practice, some parameters of this problem are uncertain. We propose two models for the bus terminal location problem with fuzzy parameters. In the first formulation, the number of passengers corresponding to each node is a...
Persistent link: https://www.econbiz.de/10010540982
A single-machine two-agent scheduling problem with a truncation learning effect is being addressed in the study. The truncation learning effect means that the actual processing time of a job is a function of the sum of processing times of already scheduled jobs and a control parameter. The aim...
Persistent link: https://www.econbiz.de/10010540984
This paper presents a combined framework of Multi-Objective Generic Algorithm (MOGA) and Monte Carlo Simulation (MCS) in order to improve backbone topology by leveraging the Virtual Link (VL) system in an hierarchical Link-State (LS) routing domain. Given that the sound backbone topology...
Persistent link: https://www.econbiz.de/10005047171
To optimize the design of reliability systems, an analyst is frequently faced with the demand of achieving several targets (i.e., maximization of system reliability, minimizations of cost, volume, and weight), some of which may be in conflict with each other. This paper presents a novel hybrid...
Persistent link: https://www.econbiz.de/10005050667