Showing 1 - 10 of 39
then used to predict the final project duration of active projects. Design/methodology/approach Project planning and …
Persistent link: https://www.econbiz.de/10014677620
. Design/methodology/approach This study first developed a conceptual evaluation framework called ‘Project Success Evaluation …
Persistent link: https://www.econbiz.de/10014677626
towards improving the design and planning processes of post-conflict housing reconstruction projects. Design/methodology …
Persistent link: https://www.econbiz.de/10014677629
outcomes in Malaysia. Design/methodology/approach – Based on the literature review, a questionnaire was designed containing 14 …
Persistent link: https://www.econbiz.de/10014677639
, including internal factors (IF) and external factors (EF) during EPC project implementation. Design/methodology …
Persistent link: https://www.econbiz.de/10014677641
claims are managed. Design/methodology/approach – In total, 58 claim factors were identified and addressed to construction …
Persistent link: https://www.econbiz.de/10014677671
performance in terms of success criteria. Design/methodology/approach A questionnaire survey was developed based on PPP …
Persistent link: https://www.econbiz.de/10014677679
) Stakeholder Induced Constraints. Design/methodology/approach A quantitative approach was adopted. A questionnaire-based survey was …
Persistent link: https://www.econbiz.de/10014677691
-organizational RM (MORM) needs. Design/methodology/approach – This case study covers three large construction management (CM) projects …
Persistent link: https://www.econbiz.de/10014677696
information modelling (BIM) system. Design/methodology/approach A building simulation approach in conjunction with a hypothetical …
Persistent link: https://www.econbiz.de/10014677702