Showing 1 - 3 of 3
It is shown that the two machine preemptive job-shop problem with mean flow-time or makespan objective function and three jobs is NP-hard. This contrasts the fact that the nonpreemptive versions of these problems are polynomially solvable if the number of jobs is arbitrary but fixed. It is also...
Persistent link: https://www.econbiz.de/10010847987
Persistent link: https://www.econbiz.de/10010759226
The paper surveys the complexity results for job shop, flow shop, open shop and mixed shop scheduling problems when the number n of jobs is fixed while the number r of operations per job is not restricted. In such cases, the asymptotical complexity of scheduling algorithms depends on the number...
Persistent link: https://www.econbiz.de/10010847871