The disastrous Wenchuan earthquake in 2008 claimed around 100 000 lives and caused direct economic losses of around RMB 845.1 billion. The tragedy has also led to accusations regarding poor or inadequate seismic resistant capabilities of buildings. Seismic rehabilitation, which includes...
Persistent link: https://www.econbiz.de/10009277637
An alternative heuristic method for scheduling repetitive projects in which resources are limited and activities may be executed with multiple modes of resource demands associated with different durations is proposed. Unlike general heuristic methods that separately analyze each competing...
Persistent link: https://www.econbiz.de/10005482401
Reduction in construction project duration is generally linked to additional cost due to more expensive resources required. Hence tradeoff between time and cost is crucial to the efficiency of a construction project. The time-cost tradeoff (TCT) issue has been studied through various...
Persistent link: https://www.econbiz.de/10008603277