Showing 1 - 10 of 33
A proprietary product such as a post-installed concrete anchor has a unique place in the engineering community that includes product design, manufacturing, testing, evaluation and design for expected service conditions. An economic model in a non-linear integer programming form is proposed for...
Persistent link: https://www.econbiz.de/10005482660
, knowledge and tools; and (5) national culture. Identity, we argue, is a key performance issue, and needs to be accounted for in …
Persistent link: https://www.econbiz.de/10009200313
disparities cause adverse effects on construction company performance. …
Persistent link: https://www.econbiz.de/10005482518
last decade in Hong Kong. A behaviour-to-performance-to-outcome paradigm is adopted to examine the process of this quality … occupants by means of post-occupancy evaluation, (2) the 'performance' of the building product by analysing the buildings …
Persistent link: https://www.econbiz.de/10005482548
economic conditions. Effective implementation of CBM requires the development of performance indicators for building components … systematic performance scales; (2) to develop a parameter that ensures clear detection of building elements that are in failing … condition; and (3) to provide a Key Performance Indicator, based on a unified scale, for the comparison of the performance of …
Persistent link: https://www.econbiz.de/10005482638
Although a wide range of human and organizational factors have been found to be important in the operation of projects, those determined by cultural variables are less well defined. One such influence concerns the notion of 'project affinity', the commitment and attachment by stakeholders and...
Persistent link: https://www.econbiz.de/10005141068
performance of building components under similar service conditions, at different periods in the building service life. Three …
Persistent link: https://www.econbiz.de/10005445726
subjective judgement. An investigation on the impact of stress on estimation performance was conducted involving 177 professional … between stress and various aspects of estimation performance are examined and a causal structural model is developed. The … results indicate that stress is a cause of negative estimation performance (resulting in weak interpersonal relationships …
Persistent link: https://www.econbiz.de/10009194449
, Chinese contractors are relative newcomers where the global market is concerned. This study compares the performance of top …
Persistent link: https://www.econbiz.de/10005269014
visualized or observed. To improve the implementation performance of construction projects, it is necessary to investigate the … amongst major project stakeholders. The results indicate that high affective commitment induces high performance and …
Persistent link: https://www.econbiz.de/10005269051