introduction of a road bridge over the Zambezi river, in August 2009 between Caia and Chimuara, with the simultaneously completed … rehabilitation of the railway bridge between Vila de Sena and Mutarara, which jointly create variation in optimal trading itineraries … transport costs, averaged over itineraries, from 17% to 42% (ATT). Results are shown to be robust for the non-random bridge …