Showing 1 - 7 of 7
Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can cope with the stochastic disturbances as well as possible. For that purpose, a timetable usually contains time...
Persistent link: https://www.econbiz.de/10014053399
Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can absorb the stochastic disturbances as well as possible. To that end, a timetable contains buffer times between...
Persistent link: https://www.econbiz.de/10014027476
In this paper, we describe a new model for the Train Unit Shunting Problem. This model is capable of solving the matching and parking subproblems in an integrated manner, usually requiring a reasonable amount of computation time for generating acceptable solutions. Furthermore, the model...
Persistent link: https://www.econbiz.de/10014053398
This paper addresses the Rolling Stock Rescheduling Problem (RSRP), while taking maintenance appointments into account. After a disruption, the rolling stock of passenger trains has to be rescheduled in order to maintain a feasible rolling stock circulation. A limited number of rolling stock...
Persistent link: https://www.econbiz.de/10014036366
Urban Public Transport systems must periodically close certain links for main- tenance, which can have significant effects on the service provided to passengers. In practice, the effects of closures are mitigated by replacing the link with a simple shuttle service. However, alternative shuttle...
Persistent link: https://www.econbiz.de/10014036952
On a daily basis, relatively large disruptions require infrastructure managers and railway operators to reschedule their railway timetables together with their rolling stock and crew schedules. This research focuses on timetable rescheduling for passenger trains at a macroscopic level in a...
Persistent link: https://www.econbiz.de/10014037038
In this paper we describe how rolling stock and passenger connections in a cyclic railway timetable can be modeled in a flexible way within the model for the Periodic Event Scheduling Problem (PESP). The PESP model was introduced by Serani and Ukovich (1989). Usually, PESP-models assume that the...
Persistent link: https://www.econbiz.de/10014167441