Long cycle times in semiconductor manufacturing represent an increasing challenge for the industry and lead to a growing need for breakthrough approaches to reduce it. Small lot sizes and the conversion of batch processes to mini-batch or single-wafer processes are widely regarded as a promising...
Persistent link: https://www.econbiz.de/10009352912
In this paper, a case study accomplished for the production planning of a German steel producer is presented. This includes the description of a lot-sizing problem and a related simple mathematical model formulated in order to meet the requirements for the mid- to long-term planning of the steel...
Persistent link: https://www.econbiz.de/10009352916
The planning of purchasing and production lot-size for multi-item multi-period multi-workstation capacitated production (MLCLSP-M) is discussed. Since the model is a NP-hard problem, this research proposes a heuristic method (A-LS), which decomposes the model into two sub-problems and...
Persistent link: https://www.econbiz.de/10009352925
The Economic Lot Scheduling Problem (ELSP) on a single facility (or machine) with the time-varying lot-sizes approach and with sequence-independent/sequence-dependent setup times of parts or products is studied in this paper. The objective is to minimise the long-run average inventory carrying...
Persistent link: https://www.econbiz.de/10005754458
A production planning problem with stochastic demands is considered in this paper. The problem is to determine over a given time horizon the production quantity of each intermediate/final product at each facility of finite capacity so that a system-wide total cost is minimised while meeting...
Persistent link: https://www.econbiz.de/10005754461
The ordering policy for retailers and the suppliers' system are influenced by lead time and deterioration. In this study, we consider deteriorating items with triangle-shaped demand and uncertain lead time. The triangle-shaped demand has the characteristic of increasing demand during the...
Persistent link: https://www.econbiz.de/10008563633
The Economic Lot Scheduling Problem (ELSP) on a single facility (or machine) with the time-varying lot-sizes approach and with sequence-independent/sequence-dependent setup times of parts or products is studied in this paper. The objective is to minimise the long-run average inventory carrying...
Persistent link: https://www.econbiz.de/10008563645
A production planning problem with stochastic demands is considered in this paper. The problem is to determine over a given time horizon the production quantity of each intermediate/final product at each facility of finite capacity so that a system-wide total cost is minimised while meeting...
Persistent link: https://www.econbiz.de/10008563652
The ordering policy for retailers and the suppliers' system are influenced by lead time and deterioration. In this study, we consider deteriorating items with triangle-shaped demand and uncertain lead time. The triangle-shaped demand has the characteristic of increasing demand during the...
Persistent link: https://www.econbiz.de/10005078482