Showing 1 - 7 of 7
The broad applications of cellular manufacturing make the cell formation problem (CFP) a core subject in the field of manufacturing. Due to the combinatorial nature of the CFP, a simulated annealing-based meta-heuristic with variable neighbourhood was developed to form part-machine cells. To...
Persistent link: https://www.econbiz.de/10009352902
The effectiveness of Monte Carlo simulation for mapping materials handling cost distributions and identifying robust solutions for general block layout problems is investigated. Small scale simulations are shown to be effective at approximating materials handling cost distributions obtained from...
Persistent link: https://www.econbiz.de/10009352909
This paper investigates a scheduling problem of non-identical parallel batch processing machines (PBPMs) with job release times and non-identical job sizes, in which jobs come from compatible product families, to minimise the total weighted tardiness (TWT). Only a few studies on PBPM problems...
Persistent link: https://www.econbiz.de/10010722755
The fuzzy C-means (FCM) algorithm is a commonly used fuzzy clustering method which conducts data clustering by randomly selecting initial centroids. With larger data size or attribute dimensions, clustering results may be affected and more repetitive computations are required. To compensate the...
Persistent link: https://www.econbiz.de/10010667472
Sports scheduling has become an important area of applied operations research in recent years, since satisfying fans' and teams' requests and revenues of a sports league and TV networks may be affected by quality of the league schedule. While this type of scheduling problem can be solved by...
Persistent link: https://www.econbiz.de/10010667494
In this paper, the dynamic single-machine scheduling problem with a sequence-dependent setup time and with minimising total weighted tardiness of jobs as the objective is investigated. Due to the dynamic nature of the problem, a function-based approach is developed that can capture dynamic...
Persistent link: https://www.econbiz.de/10010670133
This paper focuses on the flow shop sequence dependent group scheduling (FSDGS) problem with minimisation of total completion time as the criterion (Fm|f<SUB align="right"><SMALL>mls</SMALL></SUB>, prmu, S<SUB align="right"><SMALL>plk</SMALL></SUB>|ΣC<SUB align="right"><SMALL>J</SMALL></SUB>). The research problem is formulated in form of two different mixed integer linear programming (MILP) models. Comparing...</small></sub></small></sub></small></sub>
Persistent link: https://www.econbiz.de/10010691803