We consider a berth allocation problem in container terminals in which the assignment of vessels to berths is limited by water depth and tidal condition. We model the problem as a parallel-machine scheduling problem with inclusive processing set restrictions, where the time horizon is divided...
Persistent link: https://www.econbiz.de/10010574152
We consider a generalized one-dimensional bin packing model in which the cost of a bin is a nondecreasing concave function of the utilization of the bin. We show that for any given positive constant [epsilon], there exists a polynomial-time approximation algorithm with an asymptotic worst-case...
Persistent link: https://www.econbiz.de/10005283791
We consider the problem of scheduling a set of n jobs with arbitrary job sizes on a set of m identical and parallel batch machines so as to minimize the makespan. Motivated by the computational complexity of the problem, we propose a meta-heuristic based on the max–min ant system method....
Persistent link: https://www.econbiz.de/10010939779
Persistent link: https://www.econbiz.de/10005330055
Persistent link: https://www.econbiz.de/10005337387
Consider m identical machines in parallel, each of which can produce k different product types. There is no setup cost when the machines switch from producing one product type to another. There are n orders each of which requests various quantities of the different product types. All orders are...
Persistent link: https://www.econbiz.de/10005337883
Persistent link: https://www.econbiz.de/10005347306
We consider the problem of scheduling a set of n independent jobs on m parallel machines, where each job can only be scheduled on a subset of machines called its processing set. The machines are linearly ordered, and the processing set of job j is given by two machine indexes aj and bj; i.e.,...
Persistent link: https://www.econbiz.de/10008551202
We consider several two-agent scheduling problems with controllable job processing times, where agents A and B have to share either a single machine or two identical machines in parallel while processing their jobs. The processing times of the jobs of agent A are compressible at additional cost....
Persistent link: https://www.econbiz.de/10008494806
We consider coordination mechanisms for the distributed scheduling of n jobs on m parallel machines, where each agent holding a job selects a machine to process his/her own job. Without a central authority to construct a schedule, each agent acts selfishly to minimize his/her own disutility,...
Persistent link: https://www.econbiz.de/10010597602