Showing 1 - 9 of 9
Persistent link: https://www.econbiz.de/10005240636
Persistent link: https://www.econbiz.de/10005347818
Persistent link: https://www.econbiz.de/10005144289
Persistent link: https://www.econbiz.de/10005253557
Persistent link: https://www.econbiz.de/10005075171
Persistent link: https://www.econbiz.de/10005075386
Persistent link: https://www.econbiz.de/10005158587
We present a new model formulation for lot-sizing and scheduling of multi-stage flow lines which works without a fixed lead-time offset and still guarantees a feasible material flow. In the literature, multi-stage lot-sizing model formulations often use a fixed lead time offset of one period...
Persistent link: https://www.econbiz.de/10010594989
A pharmaceutical company raised the question whether an increased product portfolio could still be manufactured on the existing machinery. The proportional lot-sizing and scheduling problem (PLSP) seemed to be most appropriate to answer this question. However, although there are papers dealing...
Persistent link: https://www.econbiz.de/10008865046