Showing 1 - 10 of 10
This paper deals with the robust optimization for the cyclic hoist scheduling problem with processing time window constraints. The robustness of a cyclic hoist schedule is defined as its ability to remain stable in the presence of perturbations or variations of certain degree in the hoist...
Persistent link: https://www.econbiz.de/10010939793
We consider coordination mechanisms for the distributed scheduling of n jobs on m parallel machines, where each agent holding a job selects a machine to process his/her own job. Without a central authority to construct a schedule, each agent acts selfishly to minimize his/her own disutility,...
Persistent link: https://www.econbiz.de/10010597602
method to find the near-optimal LTB quantity in presence of an imperfect repair option of the failed parts that can be … that repair is an excellent option as alternative sourcing, even if it is more expensive than buying a new part, because of … the option to postpone the repair until the parts are needed. In addition, we show the impact of other key parameters on …
Persistent link: https://www.econbiz.de/10011209336
the failure processes of repairable systems using general repair concepts such as age-reduction when no covariate effects … are considered. This paper investigates different approaches for modelling the failure and repair process of repairable …
Persistent link: https://www.econbiz.de/10011209343
system has two types of failures. Type-I failure (minor failure) is removed by a general repair, whereas type-II failure …
Persistent link: https://www.econbiz.de/10010574183
replacement of the system at once. The repair of the system is not “as good as new”. The consecutive operating times of the system … after repair form a decreasing geometric process, while the repair times after failure are assumed to be independent and …
Persistent link: https://www.econbiz.de/10011052541
be repairable or non-repairable. Repair times are governed by a phase-type distribution. The number of deteriorating …
Persistent link: https://www.econbiz.de/10011052770
the availability of spare parts. This paper presents the joint optimisation for both the inventory control of the spare …
Persistent link: https://www.econbiz.de/10010574187
While significant progress has been made, analytic research on principal-agent problems that seek closed-form solutions faces limitations due to tractability issues that arise because of the mathematical complexity of the problem. The principal must maximize expected utility subject to the...
Persistent link: https://www.econbiz.de/10010679106
Production ramp-up is an important phase in the lifecycle of a manufacturing system which still has significant potential for improvement and thereby reducing the time-to-market of new and updated products. Production systems today are mostly one-of-a-kind complex, engineered-to-order systems....
Persistent link: https://www.econbiz.de/10010664726