Showing 1 - 10 of 23
Persistent link: https://www.econbiz.de/10005240334
Persistent link: https://www.econbiz.de/10005337737
Persistent link: https://www.econbiz.de/10005151643
Persistent link: https://www.econbiz.de/10005151921
Persistent link: https://www.econbiz.de/10005284101
In this paper, a slicing tree based tabu search heuristic for the rectangular, continual plane facility layout problem (FLP) is presented. In addition to the incorporation of facilities with unequal areas we also integrate the possibility to specify various requirements regarding (rectangular)...
Persistent link: https://www.econbiz.de/10005287521
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order...
Persistent link: https://www.econbiz.de/10005240729
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing products among the work stations along the line. On the one hand, research has focussed on developing effective...
Persistent link: https://www.econbiz.de/10005023390
Persistent link: https://www.econbiz.de/10005151437
Production processes in a wide range of industries rely on modern mixed-model assembly systems, which allow an efficient manufacture of various models of a common base product on the same assembly line. In order to facilitate a just-in-time supply of materials, the literature proposes various...
Persistent link: https://www.econbiz.de/10005253491