Showing 1 - 10 of 17
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order...
Persistent link: https://www.econbiz.de/10005240729
In manufacturing, control of ergonomic risks at manual workplaces is a necessity commanded by legislation, care for health of workers and economic considerations. Methods for estimating ergonomic risks of workplaces are integrated into production routines at most firms that use the assembly-type...
Persistent link: https://www.econbiz.de/10008914579
Nowadays, mixed-model assembly lines are applied in a wide range of industries to mass-produce customized products to order, e.g., in automobile industry. An important decision problem in this context receiving a lot of attention from researchers and practitioners is the sequencing problem,...
Persistent link: https://www.econbiz.de/10010871103
Recently, the importance of correctly designed computational experiments for testing algorithms has been a subject of extended discussions. Whenever real-world data is lacking, generated data sets provide a substantive methodological tool for experiments. Focused research questions need to base...
Persistent link: https://www.econbiz.de/10010662533
To reduce labor-intensive and costly order picking activities, many distribution centers are subdivided into a forward area and a reserve (or bulk) area. The former is a small area where most popular stock keeping units (SKUs) can conveniently be picked, and the latter is applied for...
Persistent link: https://www.econbiz.de/10010666136
Assembly line balancing problems (ALBP) consist in assigning the total workload for manufacturing a product to stations of an assembly line as typically applied in automotive industry. The assignment of tasks to stations is due to restrictions which can be expressed in a precedence graph....
Persistent link: https://www.econbiz.de/10010574195
Assembly line balancing problems (ALBP) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing any unit of the products to be assembled among the work stations along the line subject to a strict or average...
Persistent link: https://www.econbiz.de/10004973584
Persistent link: https://www.econbiz.de/10005271495
Persistent link: https://www.econbiz.de/10005278080
Persistent link: https://www.econbiz.de/10005283978