Showing 1 - 3 of 3
Persistent link: https://www.econbiz.de/10005158644
One of the largest bottlenecks in iron and steel production is the steelmaking-continuous casting (SCC) process, which consists of steel-making, refining and continuous casting. The SCC scheduling is a complex hybrid flowshop (HFS) scheduling problem with the following features: job grouping and...
Persistent link: https://www.econbiz.de/10010753510
Flowshop scheduling is a very active research area. This problem still attracts a considerable amount of interest despite the sheer amount of available results. Total flowtime minimization of a flowshop has been actively studied and many effective algorithms have been proposed in the last few...
Persistent link: https://www.econbiz.de/10010597618