Showing 1 - 5 of 5
Persistent link: https://www.econbiz.de/10005329860
Persistent link: https://www.econbiz.de/10005151878
This paper deals with the robust optimization for the cyclic hoist scheduling problem with processing time window constraints. The robustness of a cyclic hoist schedule is defined as its ability to remain stable in the presence of perturbations or variations of certain degree in the hoist...
Persistent link: https://www.econbiz.de/10010939793
This paper addresses cyclic scheduling of a no-wait robotic cell with multiple robots. In contrast to many previous studies, we consider r-degree cyclic (r  1) schedules, in which r identical parts with constant processing times enter and leave the cell in each cycle. We propose an...
Persistent link: https://www.econbiz.de/10004973640
Persistent link: https://www.econbiz.de/10005283942