Showing 1 - 10 of 16
A network needs to be constructed by a server (construction crew) that has a constant construction speed which is incomparably slower than the server’s travel speed within the already constructed part of the network. A vertex is recovered when it becomes connected to the depot by an already...
Persistent link: https://www.econbiz.de/10011264292
Persistent link: https://www.econbiz.de/10005329644
The Time and Space constrained Assembly Line Balancing Problem (TSALBP) is a variant of the classical Simple Assembly Line Balancing Problem that additionally accounts for the space requirements of machinery and assembled parts. The present work proposes an adaptation of the Bounded Dynamic...
Persistent link: https://www.econbiz.de/10009018764
In this article, we present a new exact algorithm for solving the simple assembly line balancing problem given a determined cycle time (SALBP-1). The algorithm is a station-oriented bidirectional branch-and-bound procedure based on a new enumeration strategy that explores the feasible solutions...
Persistent link: https://www.econbiz.de/10011052608
The simple assembly line balancing problem is the simplification of a real problem associated to the assignment of the elementary tasks required for assembly of a product in an assembly line. This problem has been extensively studied in the literature for more than half a century. The present...
Persistent link: https://www.econbiz.de/10005283527
Persistent link: https://www.econbiz.de/10005338034
In on-line integrated production-distribution problems, customers release jobs to a manufacturer that has to process the jobs and deliver them to the customers. The jobs are released on-line, that is, at any time there is no information about future jobs. Processed jobs are grouped into batches,...
Persistent link: https://www.econbiz.de/10005023360
Persistent link: https://www.econbiz.de/10005347087
Persistent link: https://www.econbiz.de/10005151599
Persistent link: https://www.econbiz.de/10005287472