Showing 1 - 3 of 3
Master Production Schedules (MPS) are widely used in industry, especially within Enterprise Resource Planning (ERP) software. The classical approach for generating MPS assumes infinite capacity, fixed processing times, and a single scenario for demand forecasts. In this paper, we question these...
Persistent link: https://www.econbiz.de/10009018748
Persistent link: https://www.econbiz.de/10005347219
In this paper, we study allocation strategies and their effects on total routing costs in hub networks. Given a set of nodes with pairwise traffic demands, the p-hub median problem is the problem of choosing p nodes as hub locations and routing traffic through these hubs at minimum cost. This...
Persistent link: https://www.econbiz.de/10008865377