We consider the NP-hard problem of scheduling n jobs in m two-stage parallel flow shops so as to minimize the makespan. This problem decomposes into two subproblems: assigning the jobs to parallel flow shops; and scheduling the jobs assigned to the same flow shop by use of Johnson’s rule. For...
Persistent link: https://www.econbiz.de/10010577572
In this study, we introduce an actual time-dependent and job-dependent learning effect into single-machine scheduling problems. We show that the complexity results of the makespan minimization problem and the sum of weighted completion time minimization problem are all NP-hard. The complexity...
Persistent link: https://www.econbiz.de/10010608517
We analyze the performance of the greedy algorithm for the on-line two-machine open shop scheduling problem of minimizing makespan, in which time lags exist between the completion time of the first and the start time of the second operation of any job. The competitive ratio for the greedy...