This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10005464765
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10008556631
We present a detailed analysis of the patient and resource scheduling problem in rehabilitation hospitals. In practice, the predominantly therapeutical treatments and activities which are prescribed for the patients are typically scheduled manually. This leads to rigid and inefficient schedules...
Persistent link: https://www.econbiz.de/10008679067
We present a stochastic version of the single-level, multi-product dynamic lotsizing problem subject to a capacity constraint. A production schedule has to be determined for random demand so that expected costs are minimized and a constraint based on a new backlog-oriented $\delta$-service-level...
Persistent link: https://www.econbiz.de/10008852719
In this paper, we analyze the performance of call centers of financial service providers with two levels of support and a time-dependent overflow mechanism. Waiting calls from the front-office queue flow over to the back office, if a waiting-time limit is reached and at least one back-office...
Persistent link: https://www.econbiz.de/10005138910
This paper analyzes the Steiner-Weber-Problem with piecewise linear or piecewise constant transportation costs. These non-differentiable cost functions are analyzed using different one-step and dynamic linearization methods, which are based on approximations via average and marginal costs. An...
Persistent link: https://www.econbiz.de/10005464768
In stochastic lot sizing subject to dynamic and random demand, the minimization of operational costs is not the only conceivable objective. Minimizing the tardiness in customer demand satisfaction is no less important. Furthermore, the decision maker is interested in production plan stability....
Persistent link: https://www.econbiz.de/10014471643
Long-term throughput, as a key performance indicator of a stochastic flow line, is affected by numerous parameters describing the features of the flow line, such as processing time and buffer size. Fast and accurate evaluation methods for a given set of values for those parameters are a...
Persistent link: https://www.econbiz.de/10014471646
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011776698
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011252681