Showing 1 - 10 of 47
In a recent paper [Mor, B., Mosheiov, G., 2012. Scheduling a maintenance activity and due-window assignment based on … common flow allowance. International Journal of Production Economics 135, 222–230], a scheduling problem with job …
Persistent link: https://www.econbiz.de/10010702868
This paper considers a new variant of the two-dimensional bin packing problem where each rectangle is assigned a due date and each bin has a fixed processing time. Hence the objective is not only to minimize the number of bins, but also to minimize the maximum lateness of the rectangles. This...
Persistent link: https://www.econbiz.de/10010702875
optimization problems. These optimization problems combine aspects of traditional cutting problems and traditional scheduling and …
Persistent link: https://www.econbiz.de/10010702876
In this note, we study parallel machine scheduling problem with past-sequence-dependent delivery times and a …
Persistent link: https://www.econbiz.de/10010869063
The decision whether to use all the available machines in the shop becomes very relevant when the capacity exceeds the demand. In such cases, it might be optimal to use only a subset of the machines. We study this option in a two-stage flowshop environment. Jobs are assumed to be identical, and...
Persistent link: https://www.econbiz.de/10010869075
This paper considers the scheduling problems with the objective of minimizing the total completion time on two parallel …
Persistent link: https://www.econbiz.de/10010869077
In a supply chain, a manufacturer receives jobs from suppliers at distinct time points, and produces and delivers final products to customers in batches. The manufacturer can be modeled as a single machine in the supply chain and the problem can thus be modelled as minimizing the sum of weighted...
Persistent link: https://www.econbiz.de/10010869079
This paper deals with multiple due windows assignment scheduling problems and controllable processing times on a single …
Persistent link: https://www.econbiz.de/10010869080
In this paper we consider flow shop scheduling problems with a time-dependent learning effect. The time … cases of the corresponding single machine scheduling problems. We also analyze the worst-case bound of the proposed …
Persistent link: https://www.econbiz.de/10010869107
Scheduling problem in a cellular manufacturing system is treated as the group scheduling problem, assuming that … costly and infeasible. This fact limits the applicability of group scheduling. Scheduling problem in the presence of … bottleneck machines is termed as cell scheduling. A mixed-integer linear programming model is proposed for the attempted cell …
Persistent link: https://www.econbiz.de/10010869115