Showing 1 - 4 of 4
subcritical unit situated in north India for electricity generation. In this paper, the cost data of various units of thermal … literature search. To have a realistic estimate of primary components or equipment, it is necessary to include the latest cost of … these components. The cost analysis of the plant was carried out on the basis of total capital investment, operating cost …
Persistent link: https://www.econbiz.de/10011640868
items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and …Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating … this paper. In this paper, a production-inventory model with deteriorative items in which one cycle has n production setups …
Persistent link: https://www.econbiz.de/10011773135
This paper develops an economic production quantity model in a three-echelon supply chain composing of a supplier, a …
Persistent link: https://www.econbiz.de/10013470766
completely back-ordered for the buyer. With these assumptions, the annual cost function of JELS is minimized. At the end, a …
Persistent link: https://www.econbiz.de/10010317849