Jiang, Zengqiang; Le, Zuo; E, Mingcheng - In: Journal of industrial engineering and management : JIEM 7 (2014) 3, pp. 589-604
Purpose: Build a multi-objective Flexible Job-shop Scheduling Problem(FJSP) optimization model, in which the makespan, processing cost, energy consumption and cost-weighted processing quality are considered, then Design a Modified Non-dominated Sorting Genetic Algorithm (NSGA-II) based on blood...