In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial...
Persistent link: https://www.econbiz.de/10012020090
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding...
Persistent link: https://www.econbiz.de/10011562791
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk...
Persistent link: https://www.econbiz.de/10011840798
This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than...
Persistent link: https://www.econbiz.de/10011887969
The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the...
Persistent link: https://www.econbiz.de/10011888045
In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have...
Persistent link: https://www.econbiz.de/10011950199
This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different...
Persistent link: https://www.econbiz.de/10009783299
The ability to evaluate project proposals, assessing future success, and organizational value is critical to overall business performance for most enterprises. Yet, predicting project success is difficult and often unreliable. A four-year field study shows that the effectiveness of available...
Persistent link: https://www.econbiz.de/10010225057
Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects...
Persistent link: https://www.econbiz.de/10012164586
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff...
Persistent link: https://www.econbiz.de/10012164652