Showing 1 - 10 of 31
Persistent link: https://www.econbiz.de/10011806934
Persistent link: https://www.econbiz.de/10011806935
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011734645
This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011734932
Numerous exact algorithms have been developed for solving the resource-constrained project scheduling problem. Experimental studies have shown that currently even projects with only 60 activities cannot be optimally solved within a reasonable amount of time. Therefore heuristics employing...
Persistent link: https://www.econbiz.de/10011734961
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem (RCPSP) have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences, feasible completion times or feasible subsets, they all...
Persistent link: https://www.econbiz.de/10011735591
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011736624
Persistent link: https://www.econbiz.de/10011787442
Persistent link: https://www.econbiz.de/10011787456
This study assesses the quality of seven commercial project management packages to schedule precedence- and resource-constrained projects. We introduce the basic project scheduling model and give a short survey of optimal and heuristic Solution methods. Furthermore, we outline extensions of the...
Persistent link: https://www.econbiz.de/10011743636