Showing 1 - 2 of 2
Reality (ELECTRE-III). In the first step, six criteria that play a role in software investment decisions are defined based on … importance weights were calculated. In the third step, the ELECTRE-III method is utilized to evaluate a set of investment …
Persistent link: https://www.econbiz.de/10014315066
implementing two MCDM methods, Best-Worst Method (BWM) and ELECTRE III, in a real-world case company. Based on a thorough …
Persistent link: https://www.econbiz.de/10014288287