This research focuses on the effect of setup time on lot sizing. The setting is the Capacitated Lot Sizing Problem (the single-machine lot sizing problem) with nonstationary costs, demands, and setup times. A Lagrangian relaxation of the capacity constraints of CLSP allows it to be decomposed...
Persistent link: https://www.econbiz.de/10009191407
This paper concerns the modeling of low inventory lines. Currently, most models assume that processing times are independent. We consider the differences in behavior of workers in low- and high-inventory production lines. Using a laboratory experiment we show that workers speed up when they are...
Persistent link: https://www.econbiz.de/10009191474
In practice, most multi-echelon inventory systems are managed using adaptations of single location methods. This paper shows that such methods can be dramatically inferior to methods designed to take advantage of a system's structure. This is especially true in repair parts inventory systems...
Persistent link: https://www.econbiz.de/10009191649
This paper investigates a multi-item, multi-level production scheduling problem with linear costs and production and inventory constraints at one key facility. Two multi-item problems---one in which the constraint was on shipping capability and one in which there was a final stage bottleneck...
Persistent link: https://www.econbiz.de/10009197635
This research addresses a system of flexible worker assignments in a setting where there are more workers than machines. When organized using this system, a production line balances itself by shifting the workloads continuously and automatically in response to changes in the state of the system....
Persistent link: https://www.econbiz.de/10009198014
The problem of determining both lot sizes and repeating sequences for N products on one facility is difficult due to the combinatorial and continuous nature of the problem. The work that has been done on the problem has made various assumptions ("zero-switch rule" or "equal lot size," for...
Persistent link: https://www.econbiz.de/10009198288
In this paper we present a heuristic method, based on Lagrangian relaxation, for multilevel lot-sizing when there is a single bottleneck facility. A series of Lagrangian relaxations (one for each item in the product structure) is imbedded in a branch and bound procedure. The objective is to find...
Persistent link: https://www.econbiz.de/10009203846
In this Note we present an alternative formulation to the MRP lot sizing model of Steinberg and Napier (SN) (Steinberg, E., H. A. Napier. 1980. Optimal multi-level lot sizing for requirements planning systems. Management Sci. 26 (2) 1258--1271.). The alternative is more parsimonious and the...
Persistent link: https://www.econbiz.de/10009203934
In this Note, we address the issue of safety stock considerations in an MRP environment through the use of a single identical component as a replacement for a set of multiple components. We indicate where the results reported by Collier (Collier, David A. 1982. Aggregate safety stock levels and...
Persistent link: https://www.econbiz.de/10009204007
Customer service has assumed strategic importance in most manufacturing environments. Corporate reputations often depend on how reliably promised lead times are met. A goal of filling orders within a service window of T time units is often encountered in practice. This goal ignores the...
Persistent link: https://www.econbiz.de/10009204531