In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011558760
Persistent link: https://www.econbiz.de/10011558762
Generating a regular season schedule is a demanding task for any sports league. In Europe, the creation of a suitable schedule for every national top soccer league not only has to address numerous conflicting inner-league requirements and preferences. Additionally, the games of the European Cup...
Persistent link: https://www.econbiz.de/10011558779
This paper addresses the airport flight gate assignment problem with multiple objectives. The objectives are to maximize the total flight gate preferences, to minimize the number of towing activities and to minimize the absolute deviation of the new gate assignment from a so-called reference...
Persistent link: https://www.econbiz.de/10011558806
Persistent link: https://www.econbiz.de/10003281796
Persistent link: https://www.econbiz.de/10003281803
Persistent link: https://www.econbiz.de/10001546849
Persistent link: https://www.econbiz.de/10001514349
Persistent link: https://www.econbiz.de/10001668070
Generating a regular season schedule is a demanding task for any sports league. In Europe, the creation of a suitable schedule for every national top soccer league not only has to address numerous conflicting inner-league requirements and preferences. Additionally, the games of the European Cup...
Persistent link: https://www.econbiz.de/10011733980