Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011558745
A flow line consists of a sequence of work places (or stations) through which one or more producta (or models) move one-way in order to be processed. Each model requires specific Operations which must be performed in a predefined Order. To be able to do so, the stations must be equipped with...
Persistent link: https://www.econbiz.de/10011583028
This paper deals with lot sizing and scheduling for a single-stage production System where setup costs and times are sequence dependent. A large bücket mixed integer programming (MIP) model is formulated which considers only efficient sequences. A tailor-made enumeration method of the...
Persistent link: https://www.econbiz.de/10011594621
This contribution deals with dynamic, capacitated, multi-level lot sizing and scheduling. The basic assumption is that for each item there is exactly one machine that this item can be manufactured on but no two items share a common machine. Finding an optimal solution with a greedy algorithm...
Persistent link: https://www.econbiz.de/10011613748
This contribution acquaints the reader with a model for multi-level single-machine proportional lot sizing and scheduling problems (PLSPs) that appear in the scope of short-term production planning. It is one of the first papers that deals with dynamic capacitated multi-level lot sizing and...
Persistent link: https://www.econbiz.de/10011613751
Persistent link: https://www.econbiz.de/10001709005
Persistent link: https://www.econbiz.de/10001376504
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a comprehensive literature survey, but to explain differences of formal models and to provide some first readings recommendations. Our focus is on capacitated, dynamic, and...
Persistent link: https://www.econbiz.de/10011808819
On a very abstract level, an information system consists of a set of system elements which communicate with each other. Communication is an unproductive operation, so the time needed to communicate data should be kept as short as possible and, to put it in monetary terms, the opportunity costs...
Persistent link: https://www.econbiz.de/10011734226
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011734980