algorithm that computes scenarios on the basis of these parameters. The scenarios can be used as input data for simulation … logistics such as berth planning and crane scheduling. The generator discussed here has been developed within the simulation …
Persistent link: https://www.econbiz.de/10011558784
algorithm that computes scenarios on the basis of these parameters. The scenarios can be used as input data for simulation … logistics such as berth planning and crane scheduling. The generator discussed here has been developed within the simulation …
Persistent link: https://www.econbiz.de/10011725600
We consider a project scheduling problem where the precedence constraints graph is an out-tree. The processing times can be compressed by using additional resources, which causes cost and simultaneously reduces the processing times of jobs. The objective is to minimize the sum of total lateness...
Persistent link: https://www.econbiz.de/10011558722
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011558725
Persistent link: https://www.econbiz.de/10011558729
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558730
Most scheduling problems are notoriously intractable, so the majority of algorithms for them are heuristic in nature. Priority rule-based methods still constitute the most important class of these heuristics. Of these, in turn, parameterized biased random sampling methods have attracted...
Persistent link: https://www.econbiz.de/10011558731
Persistent link: https://www.econbiz.de/10011558734
The resource investment problem deals with the issue of providing resources to a project such that a given deadline can be met. The objective is to make the resources available in the cheapest possible way. For each resource, expenses depend on the maximum amount required during the course of...
Persistent link: https://www.econbiz.de/10011558737
For most computationally intractable problems there exists no heuristic which performs best on all instances. Usually, a heuristic characterized as best will perform good on the majority of instances but leave a minority on which other heuristics do better. In priority rule-based scheduling,...
Persistent link: https://www.econbiz.de/10011558738