Showing 1 - 10 of 368
This contribution summarizes recent work in the field of lot sizing and scheduling. The objective is not to give a …-level lot sizing and scheduling. The paper concludes with some advice for future research activities. …
Persistent link: https://www.econbiz.de/10011808819
Persistent link: https://www.econbiz.de/10000609707
This paper deals with proportional lot sizing and scheduling (PLSP) and gives some insights into the properties of this …
Persistent link: https://www.econbiz.de/10011736288
This contribution generalizes the work of Drexl and Haase about the so-called proportional lot sizing and scheduling …
Persistent link: https://www.econbiz.de/10011736557
This contribution deals with dynamic, capacitated, multi-level lot sizing and scheduling. The basic assumption is that …
Persistent link: https://www.econbiz.de/10011739762
scheduling problems (PLSPs) that appear in the scope of short-term production planning. It is one of the first papers that deals … with dynamic capacitated multi-level lot sizing and scheduling which is of great practical importance. The PLSP model … refines well-known mixed-integer programming formulations for dynamic capacitated lot sizing and scheduling as for instance …
Persistent link: https://www.econbiz.de/10011743231
This paper deals with lot sizing and scheduling for a single-stage production System where setup costs and times are …
Persistent link: https://www.econbiz.de/10011744372
-level proportional lot sizing and scheduling problem with multiple machines (PLSP-MM). Four approaches are compared: Solving LP …
Persistent link: https://www.econbiz.de/10011744457
lot sizing and scheduling problem. It also presents a genetic algorithm to solve that problem. The efficiency of that …
Persistent link: https://www.econbiz.de/10011744774
project scheduling problems. First, the two problem categories are described. This includes a classification of packing … problems as well as of project scheduling concepts. While both problem classes are different with respect to their fields of … special cases of models for project scheduling. The aim is to indicate which project scheduling models can be used to capture …
Persistent link: https://www.econbiz.de/10011734909