Showing 1 - 10 of 266
Persistent link: https://www.econbiz.de/10011806934
Persistent link: https://www.econbiz.de/10011806935
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011808900
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011734645
For most computationally intractable problems there exists no heuristic that is equally effective on all instances. Rather, any given heuristic may do well on some instances but will do worse on others. Indeed, even the 'best' heuristics will be dominated by others on at least some subclasses of...
Persistent link: https://www.econbiz.de/10011734733
This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011734932
Numerous exact algorithms have been developed for solving the resource-constrained project scheduling problem. Experimental studies have shown that currently even projects with only 60 activities cannot be optimally solved within a reasonable amount of time. Therefore heuristics employing...
Persistent link: https://www.econbiz.de/10011734961
It is well-known that for many project scheduling problems the Space AS of active schedules contains at least one optimal solution for each feasible instance, so restricting heuristic construction methods to AS will improve algorithmic efficiency without foresaking the chance to eventually find...
Persistent link: https://www.econbiz.de/10011735063
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem (RCPSP) have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences, feasible completion times or feasible subsets, they all...
Persistent link: https://www.econbiz.de/10011735591
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011736624