Showing 1 - 2 of 2
The coupled task problem is to schedule n jobs on one machine where each job consists of two subtasks with required delay time between them. The objective is to minimize the makespan. This problem was analyzed in depth by Orman and Potts [3]. They investigated the complexity of different cases...
Persistent link: https://www.econbiz.de/10010999593
The coupled task problem is to schedule jobs on a single machine where each job consists of two subtasks and where the second subtask has to be started after a given time interval with respect to the first one. The problem has several applications and is NP-hard. In this paper we present a...
Persistent link: https://www.econbiz.de/10010999978