Showing 1 - 2 of 2
The paper presents a heuristic for resource constrained network project scheduling. A network project comprising both alternative deterministic decision nodes and alternative branching nodes with probabilistic outcomes is considered. Several renewable activity related resources, such as machines...
Persistent link: https://www.econbiz.de/10010750043
The paper deals with the problem of production control with disturbances. The problem is applied to semi-automated production systems where the advancement of the process cannot be measured continuously but only in preset control (inspection) points. It is assumed that the production process can...
Persistent link: https://www.econbiz.de/10010749121