Showing 1 - 3 of 3
We study the problem of designing a three level hub network where the top level consists of a complete network connecting the so-called central hubs and the second and third levels are unions of star networks connecting the remaining hubs to central hubs and the demand centers to hubs and...
Persistent link: https://www.econbiz.de/10005022876
In this paper, we concentrate on the service structure of ground-transportation based cargo delivery companies. The transient times that arise from nonsimultaneous arrivals at hubs (typically spent for unloading, loading, and sorting operations) can constitute a significant portion of the total...
Persistent link: https://www.econbiz.de/10005228124
Traffic management during an evacuation and the decision of where to locate the shelters are of critical importance to the performance of an evacuation plan. From the evacuation management authority’s point of view, the desirable goal is to minimize the total evacuation time by computing a...
Persistent link: https://www.econbiz.de/10011191171